Publications

IBM publications

Gyana R. Parija, Shabbir Ahmed and Alan J. King. On Bridging the Gap Between Stochastic Integer Programming and MIP Solver Technologies. INFORMS Journal on Computing 16(1):73-83, October 2002.

Other publications

King, A.J, Wright, S.E., Parija, G.R., Entriken and Robert. The IBM Stochastic Programming System. In Applications Of Stochastic Programming, pages 21-36. by Edited by Stein W. Wallace and William T. Ziemba.

Parija, G.R., Sarker and B.R.. Manufacturing and ordering policy for a just-in-time production delivery system. 4th Industrial Engineering and Research Conference Proceedings. edited by Bruce W. Schmeiser and Reha Uszoy, and published by the IIE, Atlanta, GA, May 1995.

Sarker, B.R., and Parija and G.R.. An economic batch size for a production-delivery system operating under a constant, lumpy demand. 3rd Industrial Engineering and Research Conference Proceedings . edited by Laura Burke and John Jackman, and published by the IIE, Norcross, GA, May 1994.

Ahmed, S., Parija, G.R., King and A.J.. A multi-stage stochastic integer programming approach for capacity planning under uncertainty. Journal of Global Optimization 26:3-24, September 2003.

Parija, G.R., Sarker and B.R.. Operations Planning in a supply chain system with fixed interval deliveries to multiple customers. IIE Transactions Special Issue on Manufacturing Logistics 31:1075-1082, December 1999.

Parija, G.R., Gadidov, R., Wilhelm and W.E.. A facet generation procedure for solving 0/1 integer programs. Operations Research 47(5):789-791, September 1999.

Sarker, B.R., Parija and G.R.. Operations Planning in a supply chain system. Proceedings of the 7th Industrial Engineering Research Conference edited by Leon McGinnis and Spyros Reveliotis(published by IIE, Norcross, Georgia), Banff, Alberta (Canada)):CD-ROM Track 5-B(4), May 1998.

Sarker, B.R., Parija and G.R.. Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy-demand delivery system. European Journal of Operational Research 89(3):593-608, March 1996.

Sarker, B.R., Parija and G.R.. Viewpoint: On "An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy: A Response. Journal of the Operational Research Society 46(2):273-274, February 1995.

Wilhelm, W.E., Srinivasa, A., Parija and G.R.. OSL Applied in the Strategic and Tactical Management of Oil Spill Clean Up. EKKNEWS, October 1994.

Sarker, B.R., Parija and G.R.. An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy. Journal of the Operational Research Society 45(9):891-900, August 1994.

Parija, G.R., Wilhelm and W.E.. An OSL-Based Implementation of a Cutting Plane Method for Solving Assembly System Design Problems. EKKNEWS, April 1994.